Where the load is transmitted lineally, the use of
strip bedding is possible. The resilient bedding vibration pads layer is normally located
within the foundation area or directly below the basement floor.
Alternatively, the basement floor slab and consequently the basement
ceiling/first floor slab and
supporting walls can be placed directly on the bedding strips. To
effectively isolate structural vibration isolation, the construction elements
adjacent to the resilient layer should be very rigid and should not
show any noticeable resonance behavior.
By placing the resilient layer on the strip foundation, the
advantage once this is completed, is that the building can be
erected in the normal way.
Subsequent vibration transmission due to structural bridging is
virtually excluded.
With a separation layer of below the first floor slab/basement ceiling,
lateral isolation of the basement walls can be eliminated. However,
all connections
between the basement and resiliently mounted structural components,
such as, i.e. stairs and service penetrations, must in addition be
resiliently separated.
|
Strip Bearing pads

|
Full surface Bearing pads

|
|


In addition to the applications mentioned, Sylomer® is an ideal
vibration Isolation
to be used between music room floors, under
amplifiers'. |